Abstract(Key Points) :
- Introduction of Maharashtra Grid and Western Regional Grid
- Integrated operation and Central Sector Power Station
- Network over view
- Load Curve and Load Duration Curve and further projections
- Seasonal Load Pattern
- System Operation and Control
- Functions of State Load Dispatch and operational aspects
- Constraints on Capacity and operating parameters
- Over view of MSEB system performance
- Operating States
- Grid Failure and Restoration
- Availability Based Tariff (ABT)
- Indian Electricity Grid Code
- Basic Structure of ABT-Significance of Unscheduled
Interchange(UI)
- Benefits and Improvements due to ABT
- MSEBs Experience with ABT regime-Load Control measures
- ER-WR parallel Operation
Important Notes and Conclusion
About the speaker
BE(Elect) from Shivaji University in 1982, joined MSEB.
ME(Power Systems) from Amravati University while in service in 1989.
Awarded PhD in Elect Engg from Amravati University in area power system
control in 1995.
Also passed MA(Marathi), DBM, ADCSSA.
21 Years experience in MSEB T&D and Load Dispatch.
About 25 technical / research papers published.
Presently working as Executive Engineer at State Load Despatch Centre of
MSEB